Onsite preparation for an air test is critical to give your dwelling the best chance to pass the air pressure test first time. Failing to prepare will in some cases lead to multiple site visits and re-tests which will add cost to your project.
Please ensure the following key points are followed and completed before the air test engineer arrives on your site.
Air Testing Site Conditions;
Please see the following air test site conditions that we require to be followed.
- Ensure the dwelling is complete (cml stage, with only odd snags remaining)
- Fixtures & Fittings: Sockets, light switches (including downlighters), should all be in place.
- Loft hatch shut – Appropriate draft excluders on all loft hatches.
- Electricity: 240 volt electricity is on.
- Toilets/sinks/showers installed with traps filled with water.
- Cracks/Holes: Any cracks or holes within the fabric of walls/floors/ceilings – Must be filled or sealed with flexible silicone for example.
- Common areas for holes are around pipes and wires, were plumbers and electricians have created holes significantly larger than required for their wire/pipe and not sealed it.
Sealing extractors to prepare the Air Test Site Conditions
The builder are to seal mechanical extracts prior to site attendance, and ensure the air test site conditions are all ready.
Please see the following extracts sealed onsite prior to starting the air pressure testing as examples of good preparation. Note when you seal a vent you are sealing the grill, not the product junction with the ceiling, this should have been flexibly sealed.


Where you are not permitted to seal for the air permeability test:
- Do not seal: External Doors, Windows or Sills, Drains, Trickle Vents and Loft Access.
- Do not use tape to temporarily cover over gaps in the envelope. Permanent fittings must be in place, sealing them will invalidate any testing carried out.
Typical Areas of Leakages, and sealing recommendations for Air Tests:
- Kitchens, Utility Rooms and Bathrooms require particular attention due the concentrated amounts pipes and wires in these areas.
- Supply & Waste water Pipes: Through the entry and/or exit of through both internal and external walls and floors. In bathrooms behind the likes of bath panels, sinks and toilets. In kitchens pipes need sealing before the kitchen cupboards are installed.
- In kitchens one common problem is the base of the wall behind the kitchen is not sealed. It has no sealed skirting board like the rest of the room, and if not sealed air can easily travel into the wall typically behind the dot and dab plasterboard. This can be the same behind bath panels in bathrooms.
- When installing plasterboard on dabs, it is good practice to use continuous beads of dabs to create a picture frame on the back of the plasterboard before installation, this helps restrict air flow behind the boards.
- Boilers: Must be properly fitted and sealed where any pipes penetrate the floor, ceiling or walls. Ensure boilers are properly assembled so that there are no air leaks within the unit itself.
- Skirting boards and architrave: Must be fitted and sealed well.
Please see the following photograph examples;

Example of sockets and fittings which would completing and perimeter sealing correctly prior to test.


An air pressure test is carried out with a large fan installed generally on the front door of the dwelling. The fan can be used to pressurise or depressurise the property, which effectively means;
When depressurising you are moving air out the front door and pulling it through all the gaps and cracks within the building,
When pressurising you are pulling air into the property with the fan for it to be forced out the gaps and cracks within the dwelling.
In both cases we are measuring how hard the fan has to work to carry out the process. In an air tight dwelling a smaller fan can be used, and a leaky dwelling a larger more powerful fan will be required. Please see our Air Testing Service page for more information.

Elmhurst Accredited Air Testing and Certificates
All air testing is carried out be accredited test engineers on the Elmhurst air tightness scheme. The scheme witnesses and audits our engineers, so they are continually having to demonstrate their air testing competence.
Air Testing results are provided with certificates. The certificates show the test result for the air test to compare with the design air permeability for the design stage SAP Calculation. (dap). The lower the test result the more air tight the dwelling is. The lower the target design air permeability is within the SAP calculation the more difficult it is to achieve a passed test result.
Air Testing at Peninsular Acoustics
At Peninsular Acoustics we have been carrying out air pressure testing for our clients for many years. We are experienced in working with clients to achieve the goal of passed air test results. Please get in touch if you require a quotation for your development, we are here to help. email [email protected]
Peninsular Acoustics also has a wide range of other services to offer to our clients including;