An air pressure test – also known as an air tightness test – is required for both residential and commercial buildings, with rules varying depending on the type and size of the building.
At Peninsular Acoustics, we are your go-to for air pressure testing. We are members of the Elmhurst Air Testing Registration Scheme, which acts to ensure the quality of our testing process, from calibration of equipment to the ability of the engineer to conduct the testing.
Part L of the Building Regulations requires all new build residential dwellings to have an air pressure test. The test certificate is required by both the SAP Assessor and the Building Inspector at completion. The target to be achieved in the air test is set by the SAP design, and is known as the design air permeability (DAP).
We have the knowledge and experience to conduct your testing and resolve any potential issues when an air pressure test fails. Rest assured you’re in safe hands with Peninsular Acoustics.
What is Air Pressure Testing?
During an air pressure test, in simple terms, a large fan is attached to the front door of the property, and air is pulled out of the property (depressurization) or pushed into the property (pressurization). An air pressure test measures the amount of uncontrolled air leakage. Air leakage refers to air that leaks through a building unintentionally – for example, through gaps, cracks and holes.
Typical examples of common air leaks are in kitchens and bathrooms and service cupboards, where pipes and wires enter rooms via unsealed holes in floors, walls, and ceilings. Other examples include the underside of skirting boards not being sealed, as typically plasterboard behind the skirting is marginally set off the floor, creating air leaks.
The result of an air tightness test is expressed as air permeability or leakage rate, typically in m3/h/m2 @ 50 Pa. The highest allowed air permeability is 10 m3/h/m2 @ 50 Pa. Typically, new residential properties aim for 5 m3/h/m2 or lower.
What Happens During an Air Pressure Test?
An air pressure test can take around two hours to complete in total. Here’s a step-by-step guide on what to expect during an air tightness test:
- The accredited air tightness tester will prepare the site by sealing intentional openings such as trickle vents and mechanical extracts.
- The tester will fill all the traps of sinks, baths, showers, and toilets by running water.
- The envelope area of the building will be measured or pre-calculated from drawings.
- They will then set up the large fan in the doorway.
- The fan will create a pressure difference between the interior and exterior of the property.
- The technicians will take readings at different pressure points, which takes around 20 minutes.
- The airflow required to reach and maintain 50 PA will be calculated and then divided by the building envelope space to define the result.
The results are gathered in the form (m3/h/m2 @ 50 Pa).
What About After an Air Pressure Test?
You will be given feedback when the test is complete. At Peninsular Acoustics, we will provide you with initial test results, issues, and observations on site, followed by a test result certificate once the data is processed within the office. With any failed tests, we provide you with suggestions to improve your test result, by diagnostic works highlighting air leakage paths for you to seal.
If the building passes – You will receive a certificate of compliance, which is needed for regulatory purposes. This certificate must be submitted to your Building Control Body, which will form part of the documentation required for your building to move towards completion and occupancy.
If the building fails – We will outline the specific areas of air leakage, as well as recommendations on how to fix them. You must then carry out corrective measures, and we will conduct another air pressure test to determine whether the building now meets the required standards.
Air Pressure Testing and Building Regulations
In the UK, air tightness testing became mandatory in 2006 – in accordance with Building Regulations Part L. Sound Insulation testing is required under Part E of the Building Regulations. We offer both here at Peninsular Acoustics.
Part L of the Building Regulations outlines the standards for air permeability in both commercial buildings and new dwellings. The 2021 version of Approved Document L states that all new dwellings must undergo air-tightness tests.
New dwellings – Part L1A
New commercial buildings – Part L2A
In the UK, the approved procedure follows CIBSE TM23, published by the Chartered Institution of Building Services Engineers (CIBSE). This directive provides guidance on air leakage testing. CIBSE TM23 is based on BS EN 13829:2001 and ISO 9972:2015.
Why Peninsular Acoustics?
Trust our expert team to help you achieve the permeability targets for new builds. We have over 20 years of industry experience and will ensure that all tests meet the necessary regulatory requirements – including Part L of the Building Regulations.
As members of the Elmhurst Air Testing Registration scheme, you can have peace of mind knowing that our testing services meet the highest standards.
We offer competitively priced air pressure test quotations as well as fast turnaround times. Get in touch for a quotation today.
FAQs
What Areas Do Peninsular Acoustics Cover?
We offer our air pressure test services in all major cities in the UK, including Liverpool, London, Birmingham, Bristol, Manchester, Sheffield, Leeds and more.
What Equipment is Used in an Air Tightness Test?
A blower door system, pressure gauges, airtight seals, are all used during an air-tightness test.
When is an Air Pressure Test Conducted?
An air pressure test is generally performed near the end of the construction process – but, of course, before the property is occupied.